SCADA Modification: Water Corporation Stirling Dam & Pipeline modification was required to enable the safe supply of water between Great Southern Town Water Supply and Metro Schemes. This was possible through the installation of a NRV bypass on the Stirling Trunk Main.
Along with the installation of the bypass, site interlocks between peer sites were required to be updated to ensure proper operation of the broader system. The project was considered in two parts:
- Implement control system for newly installed Stirling Trunk Main Bypass Valves
- Review and update of peer interlocks for the Stirling Dam Pump Station
Our experienced team successfully completed FAT in August 2021 and SAT in early December 2021.