Great Southern SCADA Replacement

Case Study

Great Southern Region Obsolescence SCADA Replacement

Water Corporation SCADA equipment throughout the Great Southern Region required an upgrade due to the existing SCADA equipment reaching their end of life. The site RTUs, PLCs and Modems were no longer supported and new replacement parts were no longer available.

Based upon individual site requirements, ACE conducted various works to upgrade the sites to current standards. This included the following:

  • Engineering/detailed design,
  • Equipment supply,
  • Calibration,
  • Installation,
  • Commissioning, and
  • As built documentation.