Case Study
Bold Park Reservoir and WTP Remedial Works
Bold Park Reservoir and WTP Remedial Works
Water Corporation’s Bold Park Reservoir Water Treatment Plant (WTP) required a functional upgrade of the Dosing Control System. This upgrade brought the system to the latest client design standard and enabled enhanced functionality of the dosing system and give the operator greater control of the process.
The project was split into two stages to accommodate modifications for the two dosing systems in operation at the reservoir. The scope of work includes the following:
- Speed control of the dosing pumps during initial de-gassing period on start-up
- Pump control for a duty-standby system as per Water Corporation Standard logic
Duty Standby Fail-over Functionality for the dosing system.
Water Treatment Plant (WTP)