Always Ready to Understand Your Project Needs

At ACE, we’ve successfully upgraded 1200 sites to GeoSCADA for a major water/wastewater utility, demonstrating our leadership in SCADA system innovation.

Project Overview

Our project aimed to enhance operational efficiency and reliability by upgrading to GeoSCADA across diverse site types—each tailored to specific operational needs using standardized templates and a unified database structure facilitated by automation tools.

Master Stations Migration Project

A key aspect of our approach was the Master Stations Migration Project. Here, we transitioned from four legacy SCADA systems to a new, streamlined design using GeoSCADA. This included adopting a grey scale GUI with strategic color highlights, aligning with ISA112 SCADA standards and focusing operator attention on critical information—reducing visual clutter and improving response times.

Outcomes

The upgrade has led to:

  • Enhanced Operational Efficiency: Simplified operations with standardized, scalable designs.
  • Improved System Reliability: Increased reliability and reduced downtime with the robust GeoSCADA system.
  • User-Focused Design: Minimized distractions, enhancing operational workflow through an improved GUI.

Conclusion

This project underscores ACE’s commitment to providing advanced engineering solutions that elevate operational capabilities and system efficiency in the water and wastewater management industry.

For more information on how ACE can help enhance your systems, contact us today!