Broome Solar Battery (BESS) SCADA Engineering

Case Study

Broome Solar Battery BESS SCADA Engineering

ACE delivered BESS SCADA engineering for the Broome solar battery project. The team integrated a solar-powered battery energy storage system (BESS) into the client’s chosen SCADA platform.

BESS SCADA reference designs

The work also established a baseline reference overview and database structure. These designs aimed to standardise layouts for future battery installations across Western Australia.

ACE’s engineering scope included:

  • Integrating the battery system with the selected SCADA platform.
  • Developing a standard reference overview.
  • Creating the supporting database structure.
  • Aligning the designs with the client’s guidelines and documentation.

A consistent basis for future sites

ACE engineers used proprietary tools to create the reference designs. The work combined SCADA integration with a common layout and data structure for later installations.

As a result, the project provided both a site integration and reference material for future BESS work.

Explore ACE’s clean energy control systems and SCADA integration services, or discuss your battery project with ACE.