Over the past few days, the ACE team successfully conducted Integrated Factory Acceptance Testing (iFAT) at our workshop for a SCADA system designed for a grid-connected Battery Energy Storage System (BESS) in Australia.

This milestone involved thorough testing of system functionality and integration, ensuring robust performance to meet project requirements. The collaboration between our skilled team and the client’s technical representatives was key to troubleshooting and validating all aspects of the system.

At ACE, we take pride in delivering reliable, innovative solutions that support the growing energy sector and pave the way for a more sustainable future.

Great teamwork, excellent results!